Sagem 3p@c – Sagem 4450E User Manual
Page 6
SAGEM 3P@C
3P@C Installation Manual
Page 0-5
Reproduction and communication in any form prohibited without the written permission of SAGEM SA
3.1.4.
Heat Dissipation Requirements
3-2
3.1.5.
Power Supply Requirements
3-2
3.1.6.
Grounding Requirements
3-2
3.1.7.
Anti-interference Requirements
3-4
3.1.8.
Other Requirements
3-4
3.2.
S
AFETY
R
EQUIREMENTS
3-5
3.2.1.
Basic Safety Requirements
3-5
3.2.2.
Antistatic Requirements
3-5
3.2.3.
Avoiding Laser Damage
3-6
3.2.4.
Lightning Protection Requirements
3-6
3.2.5.
Anti-seismic Design Requirements
3-7
3.2.6.
Fireproof Design Requirements
3-7
3.2.7.
Precautions for Equipment Handling
3-7
3.3.
I
NSTALLATION
T
OOLS AND
M
ATERIALS
3-7
3.4.
P
RODUCT
C
ONFIGURATION
L
IST
3-8
3.4.1.
Basic Configuration of the Product
3-8
3.4.2.
Optional Components
3-8
3.5.
U
NPACKING FOR
A
CCEPTANCE
3-9
3.5.1.
Preparation
3-9
3.5.2.
Unpacking
3-10
3.5.3.
Goods Acceptance
3-14
4.
Equipment Installation and Connection
4-1
4.1.
C
ABINET
I
NSTALLATION
4-1
4.1.1.
Installation on the Cement Floor
4-2
4.1.2.
Installation on the Antistatic Floor
4-8
4.1.3.
Installing the Cabinet Guide Rails
4-14
4.2.
I
NSTALLING THE
E
QUIPMENT
4-15
4.2.1.
Installing the 10U Chassis
4-15
4.2.2.
Installing the Fan Module
4-16
4.2.3.
Installing the Air Deflector Frame
4-19
4.3.
C
ONNECTING THE
P
OWER AND
G
ROUNDING
C
ABLES
4-21
4.3.1.
Connecting the Power Cables of the Equipment
4-21
4.3.2.
Connecting the Power Cable of the Fans
4-22
4.3.3.
Connecting the Grounding Cables
4-22
4.3.4.
Equipment Power Supply Test
4-23
4.4.
I
NSTALLING THE
S
ERVICE
P
ROCESSOR
U
NIT
B
OARD
(SMUB)
4-23
4.4.1.
Installing the Uplink Interface Modules
4-23
4.4.2.
Installing the RTU
4-25