beautypg.com

For internal use only – Sun Microsystems StorEdge 6900 Series User Manual

Page 61

background image

Chapter 3

Troubleshooting the Fibre Channel Links

45

For Internal Use Only

5. Rerun

switchtest

.

a. If

switchtest

fails, replace the GBIC and rerun

switchtest

.

b. If the test fails again, replace the switch.

6. If

switchtest

passes, assume that the suspect components are the cable and the

Sun StorEdge T3+ array controller.

a. Replace the cable.

b. Rerun

switchtest

.

7. If the test fails again, replace the Sun StorEdge T3+ array controller.

8. Return the path to production.

9. Return the Sun StorEdge T3+ array LUNs to the correct controllers, if a failover

occured (determine if failovers occur using the

luxadm failover

or

mpdrive

failback

commands).

This manual is related to the following products: