To Isolate the A1/B1 FC Link
1. Quiesce the I/O on the A1/B1 FC link path.
2. Run
switchtest
or
qlctest
to test the entire link.
3. Break the connection by uncabling the link.
4. Insert a loopback connector into the switch port.
5. Rerun
switchtest
.
a. If
switchtest
fails, replace the GBIC and rerun
switchtest.
b. If
switchtest
fails again, replace the switch.
6. Insert a loopback connector into the HBA.
7. Run
qlctest
.
■
If the test fails, replace the HBA.
■
If the test passes, replace the cable.
8. Recable the entire link.
9. Run
switchtest
or
qlctest
to validate the fix.
10. Return the path to production.