Fru tests available for the a4/b4 fc link segment, To isolate the a4/b4 fc link – Sun Microsystems StorEdge 6900 Series User Manual

Page 60

background image

44

Sun StorEdge 3900 and 6900 Series Troubleshooting Guide • March 2002

CODE EXAMPLE 3-8

Failed Path marked “unusable”

FRU tests available for the A4/B4 FC Link
Segment

The

switchtest

can only be run from the Storage Service Processor

The

linktest

will be able to isolate the switch and the GBIC on the switch. It

will not be able to isolate the cable or the Sun StorEdge T3+ array controller.

To Isolate the A4/B4 FC Link

1. Quiesce the I/O on the A4/B4 FC link path.

2. Run

linktest

from the Storage Automated Diagnostic Environment GUI to

isolate suspected failing components.

Alternatively, follow these steps:

1. Quiesce the I/O on the A4/B4 FC link path.

2. Run

switchtest

to test the entire link (re-create the problem).

3. Break the connnection by uncabling the link.

4. Insert the loopback connector into the switch port.

# cfgadm -al

Ap_Id

Type

Receptacle

Occupant

Condition

ac0:bank0 memory connected configured ok

ac0:bank1

memory

empty

unconfigured unknown

c1

scsi-bus

connected

configured

unknown

c16

scsi-bus

connected

unconfigured unknown

c18

scsi-bus

connected

unconfigured unknown

c19

scsi-bus

connected

unconfigured unknown

c1::dsk/c1t6d0

CD-ROM

connected

configured

unknown

c20

fc-private

connected

unconfigured unknown

c21

fc-fabric

connected

configured

unknown

c21::50020f2300006355

disk

connected

configured

unusable