FUJITSU INTEGRATED REMOTE MANAGEMENT CONTROLLER IRMC S2/S3 User Manual
Page 235
iRMC S2/S3
235
Server Management Information - Configuring the server settings
Power Cycle Delay (0 - 15)
Time (in seconds) between powering down and powering up during a
power cycle.
Ê
Click
Apply
to save your settings.
The configured settings are saved and the actions which have been
configured are performed in the appropriate circumstances.
Watchdog Settings - Configure software watchdog and boot watchdog
The
Watchdog Settings
group allows you configure the software watchdog and the
boot watchdog.
I
The settings made on the
ASR&R Options
group become active the next
time the managed server is started.
Figure 134: Server Management Information page, Watchdog Options
The software watchdog
monitors the activities of system using the ServerView agents. The software
watchdog is activated when the ServerView agents and the operating system
have been completely initialized.
The ServerView agents contact the iRMC S2/S3 at defined intervals. If no more
messages are received from a ServerView agent, it is assumed that the system
is no longer functioning correctly.
You can specify an action to be performed if this happens.
The boot watchdog monitors the phase between startup of the system and the
time at which the ServerView agents become available.
If the ServerView agents do not establish a connection to the iRMC S2/S3 of the
server within a specified time, it is assumed that the boot process has not been
successful.
You can specify an action to be performed if this happens.