FUJITSU INTEGRATED REMOTE MANAGEMENT CONTROLLER IRMC S2/S3 User Manual
Page 190

190
iRMC
S2/S3
Power Management
Power Cycle
Powers the server down completely and then powers it up again after a
configured period. You can configure this time in the
Power Cycle Delay
field of the
ASR&R Options
group (see
).
Graceful Power Off (Shutdown)
Graceful shutdown and power off.
This option is only available if ServerView agents are installed and
signed onto the iRMC S2/S3 as “Connected”.
Graceful Reset (Reboot)
Graceful shutdown and reboot.
This option is only available if ServerView agents are installed and
signed onto the iRMC S2/S3 as “Connected”.
Ê
Click
Apply
to start the required action.