beautypg.com

Wbk40 & wbk41 installation guide, P/n 1066-0901), Up involving connecting a wbk40 or a wbk41 to a w – Measurement Computing WBK Options User Manual

Page 203: K25, refer to the, P/n 1066-0901). for conveni, After the specifications section of this document

background image

1066-0901

, rev

1.0

967896

WBK40 & WBK41 Installation Guide IG-1

WBK40 & WBK41

Installation Guide

For connecting to a WaveBook/516E or to a WBK25

WBK40

14 Channel Thermocouple Input Module,

Front & Rear Views

WBK41

Multi-Function Thermocouple I/O Module,

Front & Rear Views

The following instructions pertain to both physical hardware connections and to setting up the WBK40 or WBK41 in the
Daq*Configuration control panel applet. Setup information regarding complex systems is included in the WBK Options
Manual
(p/n 489-0902) and in the WaveBook User’s Manual (489-0901). PDF versions of both documents can be accessed
from the data acquisition CD from the button on the CD’s opening screen.

CAUTION

CAUTION

CAUTION

CAUTION

Turn off power to the system devices and externally connected equipment before connecting cables.
Electric shock or damage to equipment can result even under low-voltage conditions.

Take ESD precautions (packaging, proper handling, grounded wrist strap, etc.)

Reference Note: Adobe PDF versions of user manuals will
automatically install onto your hard drive as a part of product
support. The default location is in the Programs group, which
can be accessed from the Windows Desktop. You can also
access documents directly from the data acquisition CD via the
button located on the CD’s opening screen.

Minimum System Requirements

PC system with Pentium

®

Processor

Windows 2000 or Windows XP

(Note 1)

64 Mbytes of RAM

Note 1: Consult the factory in regard to using

other Windows operating systems.

Power-up Notice for WaveBook/516E and WBK25 Applications:

When powering up the data acquisition system it is important that the WaveBook/516E or WBK25 is
powered last, and that the most remote system components are powered first. Other power-up
sequences will result in software’s failure to recognize all components.*

First, power-on the WBK expansion modules.

Second, power-on the WBK40 or WBK41, or DBK modules that are connected to the expansion

ports of the WaveBook/516E or WBK25.

Finally, power-on the WaveBook/516E or WBK25.

*

An exception to this power-up scheme is to power-on the entire system at once.


This manual is related to the following products: