Test points, Switches – Gasboy CFN Site Controller User Manual

Page 67

background image

Pump Interface Manual v1.3

9800/9820 Pump Dispenser

59

03/20/03

Gasboy CFN Series

Test Points

Test points are provided for voltage measurements.

Switches

Switch settings should be changed with the power switch OFF. The new settings are read by the
CPU board when the power is turned ON again.

Switch Bank 1

Note: 6 authorization activates must be open for CFN Series.

Switch Bank 2

This bank serves two purposes:

address setting when communicating on the Gasboy RS-485/RS-422 loop, or

pulser output rate selector when pulser data is sent to a fuel management system other
than a Gasboy CFN.

Test Point

Function

TP1

+5VDC

TP2

DC ground

Position & Definition

Setting(*=customary)

1

baud rate

*open=9600
closed=1200

2

communication mode

*open=on-line
closed =standalone

3-4

leak detect delay

see below

5

____

6

authorization activates

*open=no
closed=yes

7

totalizers

*open=normal
closed=reset

8

____

Delay Time

1-3

1-4

0

closed

closed

4

closed

open

5

open

closed

6

open

open