beautypg.com

Comtech EF Data HPCST-5000 User Manual

Page 56

background image

Single Thread System Installation

High-Power TWTA Satellite Terminals

2–10

Rev.1

(3) Release pressure

on the spring nut.

(4) Repeat Steps

3.b.(1) through
3.b.(3) for each
spring nut.

c.

Using four 5/16-18
bolts, 5/16” split
lockwashers, and 5/16”
flat washers, loosely
secure the pipe blocks
to the spring nuts.

Ensure the pipe blocks
are installed with the
long angle facing
inward, toward the
pipe, as illustrated.

Note: DO NOT
tighten the pipe block
bolts until after
mounting the TWTA
on the vertical pole.
(See Step 5.e.)

This manual is related to the following products: