beautypg.com

5user interface, 1 foreword, 2 device commissioning – EVCO EVCSR818P9EF User Manual

Page 15

background image

EVCO S.p.A.

Vcolor 818

| Installer manual ver. 1.1 | Code 144VC818E114

page 15 of 94

5

USER INTERFACE

5.1

Foreword

The following operating status exist:

-

the “off” status (the device is not powered)

-

the “stand-by” status (the device is powered and is off)

-

the “on” status (the device is powered, is on and is in stand-by for the start-up of an operating cycle)

-

the “run” status (the device is powered, is on and an operating cycle is in progress).

Hereon, the term "device switch-on" means the passage from the "stand-by" status to the "on" status. the term

"switch-off" means passage from the "on" status to the "stand-by" status.

If a power cut occurs during the "stand-by" status or during the "on" status, the device will re-propose the same

status when the power supply is restored.

If a power cut occurs during the "run" status, the device will operate as follows when this is restored:

-

if a temperature-controlled blast chilling or deep freezing operation was in progress, these will be started again

from the beginning

-

if a timed-controlled blast chilling or deep freezing operation was in progress, these will be started again from

the moment the power supply was cut-off

-

if storage was in progress, this will be re-proposed.

5.2

Device commissioning

Operate as follows:

1.

Connect the device power supply. if parameter E9 is set at 1, the device will display the EVCO splash screen for

10 s;

2.

After which it will go to the “stand-by” status.