BUCHI PrepChrom C-700 User Manual
Page 96
7 | Maintenance
BÜCHI Labortechnik AG
96/110
PrepChrom C700
Fig. 19: Check valve installation position, pump inlet
Fig. 20: Check valve installation position, pump outlet
u
Install the check valve insert (2).
• Wrench 17 mm
u
Connect the tubes (3) on the inlet of the pump.
u
Tighten both fittings (1) on the outlet of the pump.
u
Close the service door of the pump module.
See also other documents in the category BUCHI Measuring instruments:
- Rotavapo R-210 (78 pages)
- Vacuum Controller V-850 (22 pages)
- Vacuum Controller V-850 (54 pages)
- Rotavapo R II (58 pages)
- Rotavapo R-100 (60 pages)
- Interface I-100 (42 pages)
- Vacuum Pump V-700 (58 pages)
- Vacuum Pump V-100 (36 pages)
- Glass Oven B-585 Drying (34 pages)
- Rotavapo R-220 SE (109 pages)
- Rotavapo R-250 (46 pages)
- Recirculating Chiller F-125 (35 pages)
- Multivapo P-6 (76 pages)
- Syncor Analyst (46 pages)
- Syncor Analyst (60 pages)
- Sepacor Easy Purification Systems (50 pages)
- UV-Vis Detector C-640 (44 pages)
- ELS Detector C-650 (56 pages)
- Fraction Collector C-660 (36 pages)
- Cartridge C-670 (26 pages)
- KjelDigester K-446 (74 pages)
- SpeedDigester K-439 (70 pages)
- SpeedDigester K-425 (58 pages)
- Wet Digester B-440 (42 pages)
- Scrubber K-415 (60 pages)
- KjelMaster K-375 (160 pages)
- KjelFlex K-360 (74 pages)
- Distillation Unit K-350 (36 pages)
- Distillation Unit K-350 (38 pages)
- DuMaster D-480 (356 pages)