2 dry load column, preparation, 3 prep hplc column, installation – BUCHI PrepChrom C-700 User Manual
Page 48

5 | Installation
BÜCHI Labortechnik AG
48/110
PrepChrom C700
u
Tighten the knurled knob (1) to secure the upper holder.
5.5.2 Dry load column, preparation
u
Set up a dry load column according to:
• 5.5.1 Flash/prep column, preparation [
5.5.3 Prep HPLC column, installation
Preliminary tasks
u
Install the tube between the upper column holder and port no 3 of the 6
way electrical valve.
u
Install the tube between the lower column holder and the inlet of the
UV Detector module.
Tasks
u
Tighten the lower knurled knob (2).
u
Position the column (4) on the lower holder and tighten the PEEK
adapter (3).
NOTE
Hold the HPLC column during installation due to its weight.