5 check valve,replacement, 1 check valve, removal, Check valve, removal – BUCHI PrepChrom C-700 User Manual
Page 94
![background image](/manuals/656072/94/background.png)
7 | Maintenance
BÜCHI Labortechnik AG
94/110
PrepChrom C700
Tasks
u
Install the lamp (1).
NOTE
The lamp has a predefined installation position.
u
Tighten the 2 TORX screws (3).
• TORX screw driver T10
u
Connect the electric plug (2).
u
Turn the lamp socket (2) to the horizontal position.
u
Tighten the TORX screw (1).
• TORX screw driver T20
u
Reassemble the UV Detector module in reverse order to the disassembly.
Followon tasks
u
Contact your local service department for detector lamp zeroing..
7.3.5 Check valve,replacement
7.3.5.1 Check valve, removal
Preliminary tasks
u
Purge the system with a suitable solvent (isopropanol).