4 tubing prep hplc column, installation – BUCHI PrepChrom C-700 User Manual
Page 44

5 | Installation
BÜCHI Labortechnik AG
44/110
PrepChrom C700
Followon tasks
u
5.5.1 Flash/prep column, preparation [
page 47]
5.2.4 Tubing prep HPLC column, installation
Tasks
u
Install the PEEK tube (1) between the port no 3 of the 6way electrical
valve and the HPLC column inlet.
• Wrench 1/4"
• HAF790 Tubing PEEK, 1.6 mm ID
u
Install the ETFE tube (2) between the HPLC column outlet and inlet of the
UV Detector module.
• HAF820 Tubing, ETFE, 1.6 mm ID, plastic connectors