beautypg.com

Index – Rockwell Automation 6000 PowerFlex Medium Voltage Variable Frequency Drive Commissioning Manual User Manual

Page 95

background image

Rockwell Automation Publication 6000-IN007A-EN-P - October 2014

95

Index

A

Analog Input

93

C

Cabinet Plates

Pre-Commissioning Sealing

29

Commissioning

31

Control System Check

35

Procedure List

31

Setup

32

Process Flowcharts

12

Set Date

64

Set Regional Settings

65

Set Time Zone

64

Commissioning Requirements

Computer Requirements

15

Electrical Equipment

15

Hand Tools

15

Software

15

Test Equipment

15

Control System Check

35

P Parameters

Restore Settings

62

Set to Enable Testing

37

Procedure List

31

Setup

32

Energize Control Circuit

32

Simulate Closed Input Circuit Breaker

32

Simulate Warnings and Faults

45

Verify

E-Stop Functionality

50

Factory Default Settings

35

Operation to Set Frequency

43

Switching, Local to Remote Control

51

Verify Operation of

Bypass Contactors

55

Bypass Isolation Switches

52

DCS Input

61

Frequency Steps

41

Input/Output

52

,

55

Output Signals

61

Control Wiring

23

D

Diagrams

6012M Automatic Bypass Version 1

84

6012M Automatic Bypass Version 2

85

6012M Manual Bypass

86

PowerFlex 6000 without Bypass

83

Documentation and Application Review

Process Flowcharts

12

Documentation, Rockwell Automation

12

Drive Application

Review

13

Drive Components

Inspection

16

Checklist

18

Drive Megger Check

23

E

Electrical Installation Inspection

22

F

Flying Start Function

93

Functional Assessment

17

Checklist

19

I

Installation Review

21

Electrical Inspection

22

Mechanical Inspection

21

Interconnection Review

20

Checklist

20

L

Lockout

15

Safety Test

16

M

Mechanical Installation Inspection

21

N

No-Load Test

Check Cooling Fan Operation

75

Close Input Circuit Breaker

75

Close Isolation Switches in Bypass Cabinet

75

Configure P and T Parameters

68

Energize Drive Control Circuit

68

Operate Motor by HMI

76

O

Overviews

Commissioning

31

Documentation and Application Review

12

Load Test

80

No-load Test

67

Special Function Parameter Settings

87

P

Power Cabling

22

Color Coding

22

Pre-Commissioning

Cabinet Plates

29

Computer Requirements

15

Drive Megger Check

23

Electrical Equipment

15

Final Steps

29

Functional Assessment

17

Checklist

19

Installation Review

21

Electrical Inspection

22