2 - preparation and inspection, Gather required tools and test equipment, Lockout and tagout – Rockwell Automation 6000 PowerFlex Medium Voltage Variable Frequency Drive Commissioning Manual User Manual

Page 15: Chapter 2, Preparation and inspection, Chapter

background image

Rockwell Automation Publication 6000-IN007A-EN-P - October 2014

15

Chapter

2

Preparation and Inspection

Gather Required Tools and
Test Equipment

Hand Tools

Metric wrenches and sockets

Torque wrench

Assortment of screw drivers

Wire stripper/cutter

Electrical Equipment

High voltage gloves – 17 kV insulation rating (minimum)

Anti-static strap

Live-line tool (Hot stick)

5 kV Insulation Tester

Test Equipment

600V (1000V rating) digital multimeter with assorted clip leads

Computer Requirements and Software

Laptop computer

USB cable

PLC program

CCW software

Lockout and Tagout

SHOCK HAZARD: Servicing energized industrial control equipment can be
dangerous. Severe injury or death can result from electrical shock, burn, or
unintended actuation of control equipment. Hazardous voltages may exist in
the cabinet even with the input circuit breaker in the off position. Required
practice is to disconnect and lock out control equipment from power sources,
and confirm discharge of stored energy in capacitors. If it is necessary to work in
the vicinity of energized equipment, the safety related work practices outlined
in Electrical Safety requirements for Employee Work places must be followed.
Before attempting any work, verify the system has been locked out and tested
to have no potential.