Commissioning

Introduction

A number of activities are required before the Control System Check can be
performed.

The complete Control System Check requires the following procedures to be
performed.

ATTENTION: The Control System Check requires LV Control power only. The
Input Circuit Breaker must remain locked out and tagged out for this procedure.

Procedure

Page

Simulate Closed Input Circuit Breaker

32

Energize Control Circuit

32

Procedure

Page

Verify Factory Default Settings

35

Set P Parameters to Enable Testing

37

Verify Operation of Frequency Steps

41

Verify Operation to Set Frequency

43

Simulate Warnings and Faults

43

Verify E-Stop Functionality

50

Verify Switching from Local Control to Remote Control

51

Verify Operation of Input/Output and Bypass Isolation Switches (Manual Bypass)

(1)

(1) Only required if a bypass configuration is supplied.

52

Verify Operation of Input/Output and Bypass Contactors (Automatic Bypass)

(1)

55

Verify Operation of DCS Input and Output Signals

61

Restore P Parameter Settings

62