beautypg.com

6 commissioning, 1 before initial switch-on, Commissioning – Lenze E94AYCEO User Manual

Page 33: Before initial switch-on, 6commissioning

background image

6

Commissioning

6.1

Before initial switch-on

33

Lenze · E94AYCEO communication module (EtherNet/IP™) · Communication Manual · DMS 3.0 EN · 12/2013 · TD17

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

6

Commissioning

During commissioning, plant-specific data such as motor parameters, operating parameters,

responses, and parameters for fieldbus communication are defined for the inverter. Lenze devices

use codes for this purpose.
The codes of the inverter and for communication are saved to the memory module in a non-volatile

data set.
In addition, there are codes for diagnosing and monitoring the stations.

Parameter reference

( 88)

6.1

Before initial switch-on

Note!

When parameterising the communication module, please note that the code number

depends on the slot of the Servo Drive 9400 into which the communication module is

plugged.
The first two digits of the code number indicate the slot:

• C13nnn for slot MXI1

Parameters of the communication module for slot MXI1

( 90)

• C14nnn for slot MXI2

Parameters of the communication module for slot MXI2

( 103)

Additionally set

Parameters of the standard device that are relevant to communication

( 88)

.

Stop!

Before switching on the Servo Drive 9400 and the communication module for the first

time, check the entire wiring for completeness, short circuit and earth fault.