Badger Meter ReadCenter User Manual
Page 79
![background image](/manuals/371200/79/background.png)
5 Repeat steps 2…4 until all four schedules are added
When complete, the window should look similar to the example shown here The example shows the recommended
settings for the gateway schedules
6 Click Close when the four schedules are added and saved
Schedule Operations – Four Options
When adding a schedule, select one of the following four operations using the Operation drop-down menu
Update Assignments
This operation sends updates like assignments, modifications to assignments and requests for more data along with other
requests
Get Current Reads
This operation obtains the latest read that was heard by the gateway from each endpoint at the time the schedule runs
Get Historical Reads
This operation obtains the last complete block of interval reads from each endpoint set to obtain interval reads If the interval
reads are missing, the operation instructs the gateway to obtain reads from the endpoint and fills in missing data
Get Receive Log
This operation obtains a list of all endpoints heard by the gateway and analyzes it to see how well the endpoints are
performing This operation should repeat, at most, at a weekly interval
User Manual
Page 79
June 2014