beautypg.com

Pvc backup over the network interface, Setting up back-to-back operation, Changing operating mode – Paradyne 9128-II User Manual

Page 58

background image

3. Configuration

3-24

April

2002

9128-A2-GB20-60

PVC Backup Over the Network Interface

Generally, backup can be performed on the network interface’s frame relay link
using a backup PVC, as well on an ISDN link; the unit does not have to have the
ISDN DBM feature.

In this case, create a DLCI Record on the network interface that will be used for
backup, then modify the PVC Connections or Management PVCs to add the
alternate destination.

Setting Up Back-to-Back Operation

Using this special feature, you can set up two FrameSaver units that are
connected back-to-back without frame relay switches between them, as in a test
bench setup using a crossover cable.

Changing Operating Mode

When setting up back-to-back operation:

T

One unit must be configured for Standard operation, which is the setting for
normal operation.

T

The other unit must be configured for Back-to-Back operation so it presents
the network side of the UNI (user-network interface).

Only one of the units will have its operating mode changed.

Procedure

To set up back-to-back operation:

1. On the unit to be configured for Back-to-Back operation, manually configure

DLCIs; DLCIs should be configured before connecting the two units.

2. Access the Change Operating Mode screen.

Main Menu

Control

Change Operating Mode

3. Select Back-to-Back Operation, and respond Yes to the

Are you sure?

prompt.

4. Save the change.

Procedure

To return the unit to normal operation:

1. Return to the Change Operating Mode screen and switch back to Standard

Operation.

2. Respond Yes to the prompt and save the change. The units can be

reconnected to a standard frame relay network.

This manual is related to the following products: