Paradyne 9128-II User Manual
Page 393
Index
9128-A2-GB20-60
April 2002
IN-7
Link
(continued)
setting up ISDN profiles, 3-53
Source, 3-71
Status, 3-53
Traps, 3-93
Traps Interfaces, 3-93
troubleshooting management, 6-5
TS Management, 3-78
linkUp and linkDown
and PVC availability, 1-8
Behavior, 3-26–3-27
Clearing Event (N3), 3-28, 3-66
configuring frame relay and, 3-26
Down, 5-22, 6-9
Error Event (N2), 3-27, 3-66
frame relay statistics, 5-61
Heartbeat (T1), 3-28, 3-67
Inbound Heartbeat (T2), 3-28, 3-67
N4 Measurement Period (T3), 3-28, 3-67
OK control lead, 5-11
packet utility, 6-5
Parameters, 3-66
pass-through, 3-26
Protocol, 3-65
Status Enquiry (N1), 3-28, 3-66
trace log, 6-6
uploading packet capture data, 5-79
local
Log
LMI Trace, 6-6
Trap Event, 5-68
logging in, 2-2
logging out, 2-3
Login
creating, 4-12
ID, 4-12
modifying and deleting, 4-13
Required, 3-88, 3-100, 3-104, 4-3, 4-6–4-7
Loopback
Data Channel, 6-32
DTE, 6-30
Line, 6-27
Payload, 6-28
Port (DTE) Initiated, 3-45
PVC, 6-23
Remote, 6-31, 6-33
Repeater, 6-29
V.54, 6-32
LOS
at DSX-1, 5-22, 6-10
at ISDN PRI, 5-23
at Network, 5-23, 6-10
LED, 5-8, 5-10
linkDown trap, B-11
Loss of Signal
M
MAC address, 5-3
Main Menu
maintenance, 5-1
making input selections, 2-9
Management
and Communication
General SNMP
OpenLane, 1-9
OpenLane system, 1-9
PVCs, 3-80
SNMP, 3-86
troubleshooting link, 3-77, 6-5
mass termination cable, C-13
Max Port Rate, 3-43
Maximum Link Rate, 3-54
MDM connector, C-15
menu
branches, 2-4
Configuration, 3-3
main, 2-4
path, 2-5
selecting from, 2-8
structure, A-1