RLE LD5200 V.2.3 User Manual
Leak detection, User guide ld5200
Table of contents
Document Outline
- Product Overview
- Installation
- 2.1 Prepare for Installation
- 2.2 Mount the LD5200
- 2.3 Establish Physical Connections
- 2.3.1 TB1: 4-20mA Output
- 2.3.2 TB2: Sensing Cable Interface
- 2.3.3 TB3: Maintenance Relay
- 2.3.4 TB4: Two Fault/Leak Relay Outputs
- 2.3.5 P1: EIA-232 Connector
- 2.3.6 SW1: TB5 Port 3 Termination Switch
- 2.3.7 TB5 and TB6: EIA-485 Modbus Ports
- 2.3.8 SW2: TB6 Port 2 (Bottom Row) Termination Switch
- 2.3.9 SW3: TB6 Port 1 (Top Row) Termination Switch
- 2.3.10 P2: RJ45 Network
- 2.3.11 P3: Optional Power Connection
- 2.3.12 TB7: Input Power (from Input AC Power Supply)
- 2.3.13 DS1: Status LED
- 2.4 Connect the SeaHawk Sensing Cable
- 2.5 Apply Power to the LD5200
- 2.6 Configure Communications
- 2.7 Test the System
- 2.8 Calibrate Cable Resistance
- 2.9 Configure Security Settings
- 2.10 General Operation
- LCD Touch Screen Interface
- Web Interface
- 4.1 Home Page
- 4.2 Identity
- 4.3 Configuration
- 4.4 Historical Data
- 4.5 Refresh
- Modbus Communication
- Update Firmware
- EIA-232 Interface
- Preventive Maintenance
- Troubleshooting
- 4-20mA Output Testing
- Technical Specifications