Lingenfelter L250280197 Lingenfelter C5 Corvette E-Force Supercharger Install Kit v2.9 User Manual
Page 74

Page 73
254. Route the TPS extension harness
(PN: L480060197) between the inlet housing and
the power steering reservoir. Run the extension
harness under the throttle body and around to the
TPS sensor. Connect the TPS extension harness
to the TPS sensor.
255. Using punches to hold the top radiator
shroud template in place on the upper radiator
support, use the center punch to mark the two (2)
holes to be drilled.
256. Drill the holes to the diameters specified
on the template.
257. Using a 5mm Allen socket, install the
supplied screw (PN: 92095A294), two (2)
washers (PN: 30800), and M8 nylock nut (PN:
41754) for each side of the upper radiator shroud
so that the inlet tube can slide onto the studs.
The locations of these studs are illustrated in the
following step.