Lingenfelter L250280197 Lingenfelter C5 Corvette E-Force Supercharger Install Kit v2.9 User Manual
Page 52

Page 51
166. Determine whether the black ground wire
needs lengthened to reach the factory ground
stud (pictured in the next step). If necessary,
lengthen the black ground wire. Next, slide a
piece of heat shrink tubing over the black ground
wire. Then, crimp the insulated eye connector
to the black ground wire. Finally, slide the
heat shink tubing over the crimped joint and
heat to seal the joint.
ALTERNATIVE METHOD: After lengthening
black ground wire, connect an insulated and
sealed eye connector (PN: 23831 or equivalent-
not included in the kit) to the black ground wire.
167. Route the ground wire around the battery
tray and fasten to the factory ground stud with the
10mm factory ground nut. The ground is located
below and slightly to the side of the positive
battery cable.
168. Route the pressure switch harness around
the battery tray and along the back of the engine
towards the driver-side. Let the harness hang
temporarily.
169. Locate the connector with the light green
identification tape on it. This is where the Boost-
A-Pump wires will be spliced into.