2 checking the package contents, Package contents, Package contents -3 – KEYENCE DL-EP1 User Manual
Page 13: Checking the package contents -3, Checking the package contents
1-3
1
B
efo
re
U
sin
g
- EtherNet/IP Compatible Network Unit DL-EP1 User’s Manual (IL) -
1-2
Checking the Package Contents
Before using the DL-EP1, make sure that the following equipment and accessories
are included in the package. We have thoroughly inspected the package contents
before shipment.
However, in the event of defective or broken items, contact your nearest KEYENCE
office.
Package contents
List of Optional Parts
Package Contents
DL-EP1 main unit x 1
Expansion connector
sticker x 1
End unit x 2
OP-26751
Instruction manual x 1
• STP (shielded twisted pair) cable
(Category 5e, straight)
- OP-51504 (0.2m)
- OP-51505 (0.5m)
- OP-51506 (1m)
- OP-51507 (3m)
- OP-51508 (5m)
* The working ambient temperature of the above
cables are 0 to 50°C.
See also other documents in the category KEYENCE Sensors:
- LR-TB2000 Series (12 pages)
- LR-TB5000 Series (12 pages)
- LR-ZB250AN/AP (4 pages)
- LR-ZB250AN/P (3 pages)
- LR-ZBxN/P Series (3 pages)
- LR-ZBxxB (3 pages)
- OP-85135 (1 page)
- PZ-G Series (2 pages)
- PZ-V/M (2 pages)
- PS-N10 Series (12 pages)
- PX-10 (10 pages)
- CZ-V21A(P) (10 pages)
- CZ-K1(P) (8 pages)
- CZ-V1 (8 pages)
- FS-N10 Series (6 pages)
- FS-N10 Series (116 pages)
- FS-N15CN (1 page)
- FU-93(Z) (2 pages)
- FU-V Series (2 pages)
- FS-V30 (6 pages)
- FU-A40 (1 page)
- NU/FS-N Series (16 pages)
- FS-V33(P) (8 pages)
- FS-V21 (4 pages)
- FS-V22 (4 pages)
- FS-V11(P) (4 pages)
- FS-V1(P) (4 pages)
- LV-N10 Series (112 pages)
- LV-N10 Series (12 pages)
- LV-S62 (1 page)
- OP-84350 (1 page)
- LV-SA (10 pages)
- LV-SB (12 pages)
- OP-87305 (1 page)
- LV Series (10 pages)
- LV-B102 (1 page)
- EV-108M(U) (1 page)
- EZ Series (1 page)
- EM Series (1 page)
- ES-M1(P) (3 pages)
- EX-V Series (120 pages)
- EX-500(W) Series (16 pages)
- GV Series (10 pages)
- IA Series (8 pages)
- LB-1000(W) (24 pages)