RKI Instruments EAGLE 2 Manual User Manual
Page 160

150 • PID Calibration
EAGLE 2 Operator’s Manual
31. If you want to change the PID channel’s calibration gas value, follow
Step 5 - Step 24 above beginning with the PID Calibration Gas Value
Screen below instead of the standard channel Calibration Gas Value
Screen.
32. With the PID Calibration Gas Value Screen displayed, press and release
the POWER ENTER RESET button to proceed to the Calibration In
Process Screen for the PID channel with CAL IN PROCESS flashing.
If you do not want to proceed with the calibration, press and release the
DISPLAY ADJUST NO button to return to the PID Cal Gas Values
Screen.
If you do want to continue with the calibration, proceed to the next step.
33. Screw the PID calibration cylinder onto the demand flow regulator.
34. Connect the tubing from the regulator to the rigid tube on the probe.
Allow the EAGLE 2 to draw gas for one minute.
35. Press and release the POWER ENTER RESET button to set the span
adjustment for the PID channel to the programmed value.
CAL GAS VALUE
IBL 100 ppm
ENTER TO BEGIN CAL
CAL IN PROCESS
IBL 0 ppm
ENTER WHEN DONE