beautypg.com

Rules – Franklin Fueling Systems T5 Series Fuel Management System Programming Guide User Manual

Page 49

background image

45

There are two ways to program the Hose Position:

• Manually-If you know the D-Box grade position you can manually select the Position number from the drop down

list.

Query Button

• By selecting

Q next to the Fueling Point, the gauge will automatically Query the D-Box and fill in the information. For

the Query function to work, all equipment must be installed and connected, and all positions must be set to 0.

After hitting the Query button, you will be prompted that programming for that fueling point will be overwritten. Select OK.
You will then be prompted to dispense a small amount of product (approximately 0.03 gal.) Follow the on-screen instructions.
The positions will then be automatically entered into the programming. If other fueling points are identical, simply hit the

Copy button © and the positions will fill in. There is no need to re-query and dispense fuel if fueling points are identical.

Rules

Rules can be used to generate the DIM reports.

The following is an example of generating a daily reconciliation report:

In the example above, two rules are used. The first rule Rule-Reconciliation Report is used to define the start time of the

reconciliation period. In this case , 5:00 a.m. The two actions are used to 1) Open a new period, which closes the last one,

and 2) Generate a Summation Report. When a summation report is generated, it is stored, but not printed.

To print the report, a second rule is established. In the example, this is the Print Reconciliation Report rule. A DIM

reconciliation report can be printed per the customer’s request.