Dim programming – Franklin Fueling Systems T5 Series Fuel Management System Programming Guide User Manual
Page 46

42
DIM Programming
1. For Web Browser programming capability, connect a computer to the T5 series tank gauge. (See programming
section of this manual for connection information)
2. From the
Home screen, click Setup
3. Click
System Configuration, then Modules Expected.
Note: The TS550 and TS5000 tank gauge systems can be built with the DIM module installed in the console. It is also
possible to have DIM capability installed by a technician in the field. For information on installing the DIM module in
the field, refer to DIM Module Installation Guide (part 000-2044)
4. If the TS550 / TS5000 was sent with DIM capability, verify that under
Modules Expected, DIM is set to 1.
5. If the DIM module was installed in the field, you may need to set DIM to 1. Click on Edit in the upper right corner
of the screen to allow the DIM setting to be changed to 1.
6. Under Setup, click on
Dispenser Interface / Precision.
7. Volume Precision refers to the number of digits to the right of the decimal. It will only affect how the information
is displayed. Default is 3.
8. Dispenser Volume can be entered as Gross or Net.
a. Gross-not temperature compensated (typical US)
b. Net-temperature compensated (typical Canada)
9. Under
Dispenser Interface, click Dispenser Interface Modules
10. Type refers to the manufacturer of the Dispenser Distribution box. Select the type from the drop down list.
Some typical examples:
• Gilbarco-Universal D-Box (PA0261 Series)
• Wayne-Wayne/Dresser D-Box
• GSite-Gilbarco MOC G-Site and Passport Systems
• Tokheim-M98, M94 Power Center, 67 DBoxes