beautypg.com

Cable platforms and connections, Generation 1 cable connections, Notice – Smithco Envizio Pro Installation & Operation Manual User Manual

Page 27

background image

3

Manual No. 016-0171-148

17

Installation

Cable Platforms and Connections

Two cable platform options are available for use with the Envizio Pro or Envizio Pro II field computers. Each
platform offers a range of optional features which can be added to the control system at any time.

Generation 1 Cable Connections

Important:

Ensure that the Envizio Pro or Envizio Pro II field computer has been properly mounted and all

component cabling is connected properly before connecting the Envizio Pro or Envizio Pro II to power.

FIGURE 4.

Generation 1 Main Interface Cable Connection Diagram

NOTICE

Please review the Raven CANbus Network
Installation Manual
for installation instructions
for the specific cable platform being installed
with the field computer prior to beginning
installation. Contact a local Raven dealer for
assistance or to purchase additional
components necessary to set up the CANbus
system.

+12V DC

GND

Auxiliary
Power Output
3 Amps Max.

Ext. Switch

+12V Switched

Console

DGPS

CANbus

To Field Computer
Main Interface Port

This manual is related to the following products: