Resuming the job, Handling outsorted material, Resuming the job -6 handling outsorted material -6 – Pitney Bowes DI950 FastPac Inserter User Manual
Page 98: 5 • troubleshooting

5-6
SV61311 Rev. E
5 • Troubleshooting
Resuming the
Job
To resume running your job after a stoppage is cleared:
1. Make sure that there are no error messages on the screen and that all
system covers are closed.
2. Press START.
• If the error message on the screen instructed you to remove mate-
rial in trays to start a new collation, pressing START will begin a new
collation, otherwse
• The job will resume counting from the last complete mail piece that it
produced.
During the recovery from jams and other machine stoppages, the system
will automatically clear material from the transport deck that cannot be
completed by the inserter.
The system counts all mail pieces that it has successfully completed (trial
pieces included), but partially assembled pieces are not counted and are
transported to the upper divert area. The user has two options The system
handles outsorts in these ways:
• Discard the items.
• Manually assemble the piece.
Handling
Outsorted
Material