Tighten the cable tie around the cables, and cut off the
excess cable tie material.
Warning: Over-tightening the cable ties may damage the
sensor cables.
2. Secure the cables with a cable tie and plastic anchor every 18 to
24 inches along the pipe crown (when necessary) from the ring
to the manhole. If plastic anchors will not serve as adequate
anchors based on the structure of the pipe, install ¼-inch x 2
¼-inch bolts instead.
3. Secure the cables every 18 to 24 inches up the side of the
manhole to the monitor location. Loose cables could present a
manhole safety hazard or increase the potential for sensor or
monitor damage to occur. If plastic anchors will not serve as
adequate anchors based on the structure of the manhole wall,
install ¼-inch x 2 ¼-inch bolts instead.
Securing the sensors cables along the pipe and into the manhole