ADS Environmental Services FlowShark QR 775002 A4 User Manual
Page 44
![background image](/manuals/599703/44/background.png)
3-10
ADS FlowShark Manual
Sliding the ring stabilizer onto the ring
3. Slide the ring stabilizer all the way around the ring until it is
about 4 inches from the welded metal band at the other end of
the ring.
Moving the ring stabilizer into position
4. Position the ring with the downstream edge (edge with the
holes) facing you.