4-28
ADS FlowShark Manual
include issues such as the manhole location in relation to
the pedestal, existing landscape, utilities present, and
excavation costs.
Notify the local underground utilities locating service
concerning the desired pedestal location and antenna cable
route. Typically, notification must occur 2 to 3 days before
excavation activities are scheduled to begin.
4. Using a post hole digger or shovel, dig a hole at the designated
pedestal location approximately 4 inches deep and slightly
larger than the diameter of the pedestal base to accommodate
the base and the stake.
5. Dig a trench at least 8 inches deep between the hole and the
manhole, tapering down from the pedestal location.
Hole, trench, and manhole
6. Drill a hole at least a ½ inch in diameter in the corbel of the
manhole as close as possible to the bottom of the trench using a
corbel drill.
7. Drive the stake of the pedestal into the ground at the designated
location until approximately 4 inches of the stake remain above
ground level. Be sure to avoid driving the stake in at an angle;
the pedestal should not be tilted once attached to the stake.