ADS Environmental Services FlowShark QR 775002 A4 User Manual
Page 263

In-4
ADS FlowShark Manual
MLI, 6-20
Modbus, 9-1
Modbus Slave ID, 9-3
modem selection, 6-21
monitor
activation, 6-25
activation logs, 6-49
boards, 2-4
collecting data, 6-37
communication
landline, 2-6
wireless, 2-6
configuration, 6-3
creating a monitor location, 6-5
creating an installation table,
6-7
editing the pressure device,
6-19
editing the ultrasonic device,
6-14
editing the velocity device, 6-16
selecting devices, 6-11
connecting sensors, 3-45
connectors, 2-13
description, 2-4
GPRS, 2-6, 4-18
inspection, 10-2, 10-3
installation, 7-1
mounting to the manhole rim,
7-7
mounting to the manhole wall,
7-4
installing wireless communication,
4-18
maintenance, 10-2
MLI, 6-20
opening enclosure, 10-6
power
battery packs, 2-15
external source, 2-15
processor board, 2-7
replacing 12-volt battery packs,
10-4
temperature, 6-21
troubleshooting, 10-14
upgrading the firmware, 6-46
viewing diagnostic logs, 6-49
wireless, 2-6
monitor configuration, 6-3
creating a monitor location, 6-5
creating an installation table, 6-7
editing the pressure device, 6-19
editing the ultrasonic device, 6-14
editing the velocity device, 6-16
MLI, 6-20
selecting devices, 6-11
N
network interface box
connecting wires from lightning
protection module, 4-15
inspection, 10-11
O
on-site communication
using the direct connection cable,
4-38
P
pipe conditions, 3-4
pipe table, 6-7
port selection, 6-21
power
12-volt battery packs, 2-15, 10-4
external DC source, 2-15
pressure depth sensor
description and operation, 2-18
editing the device, 6-19
installation, 3-20
mounting sensor to the ring, 3-20
replacing the desiccant in the dryer
tube, 10-10
replacing the dryer tube, 10-9
running diagnostics, 6-28