Index – ADS Environmental Services FlowShark QR 775002 A4 User Manual
Page 260

In-1
Index
1
1/2-band mount, 3-38
3
3/4-band mount, 3-35
A
activating the monitor, 6-25
activation logs, 6-49
ADS power supply
installation, 5-4
specifications, A-8
analog input device (FlowShark)
editing, 8-5
analog input/output, 8-1
analog output card device
(FlowShark)
editing, 8-13
antenna
inspection, 10-11
installing in a pedestal, 4-25
installing in the road, 4-19
installing on a roof or other
protected structure, 4-36
installing on an enclosure,
conduit, or antenna mast, 4-34
specifications, A-11
B
battery pack
setting minimum voltage, 6-21
battery packs, 2-15
minimum voltage requirements,
10-4
replacement, 10-4
boards, 2-4
processor, 2-7
C
cables
direct connection cable
connecting to the monitor and
field computer, 4-38
sensor
securing in the pipe/manhole,
3-43
securing to the band, 3-41
securing to the ring, 3-21
telephone
laying cable between monitor
and service locations, 4-2,
4-27
preparing for connection to
lightning protection, 4-6
wiring to monitor, 4-8
Cingular Wireless, 4-18
cleaning the sensors, 10-8
collecting data from the monitor,
6-37