44

Rockwell Automation Publication 7000-IN006B-EN-P - May 2013

Chapter 4 Commissioning Preparations

3. DC current test waveforms (dc voltage and dc current) and variables while

running DC test

4. Load Test waveforms (line and load voltage and current waveforms at 50%

and 100% load or whatever maximum load and speed allowed by the
customer)

5. Final drive parameter settings and variables (running motor at max speed

and load) captured at SERVICE LEVEL ACCESS.

6. Modified PLC program (if applicable)
7. Synchronous transfer waveforms (for synchronous transfer applications)
8. Marked-up drawings
9. Summary of issues/failures encountered during commissioning

Ensure that all documents and data files (waveforms, parameter settings, variables,
trend data, etc.) intended fopr submission are properly named, labeled and
organized.

IMPORTANT

If the commissioning datasheets submitted by the commissioning engineer are
incomplete and/or the required commissioning data, such as harmonic
waveforms, dc test waveforms, sync xfer waveforms etc, are not captured
correctly or the required data is missing, then it can delay the processing of
expense invoices submitted by the engineer.

IMPORTANT

While the Field Service Engineer (FSE) is still at the site, he MUST send the
following information to MV Tech Support for review via e-mail at
[email protected]:
• Drive setup after completing the auto-tuning

• Drive variables captured in running condition (at load or no load or

uncoupled or with load)

• Line voltage and line current waveforms for harmonics on AFE drives when

drive is energized

• Black Box Data before leaving the site, followed by instructions on relevant

Tech Note.