141
Appendix
D
History of Changes
This appendix summarizes the revisions to this manual. Reference this appendix
to determine what changes have been made across multiple revisions.
7000-IN006A-EN-P,
September 2011
Change
Commissioning material removed to new manual
Converted documentation from Word to FrameMaker
Conditionalized text in shared chapters
Specifications removed to Technical Data publication
Numbering styles for graphics and tables changed
Significant rewrites to change passive to active voice
Replaced words for cursor keys with symbols
Added consistent formatting for key names, i.e. [Enter]
Removed all references to 6-pulse motor controllers
Significantly reduced text in Intro chapter to remove sales-oriented content in favour of a focus on technical content
relevant to post-sales user documentation.
Added paragraph: “Use this document in conjunction with the most recent version of the Rockwell Automation
“Commissioning Guidelines for MV PF7000 [A/B/C] Frame Drives with ForGe Control” document, available to field
service engineers on the Intranet at http://rain.ra.rockwell.com/mvb.”
Replaced last three bullet points from “Before Commissioning” section with text: “Applying power and tuning or
performance-testing the drive are part of the actual commissioning process, not part of the preparation”
Added “Commissioning Guide lines for Rockwell Automation MV PF7000 Frame drives (available internally at http://
rain.ra.rockwell.com/mvb)” to list of required TechPubs
Added resource bullets: “Functional specifications for the drive to be commissioned (generally available from the online
MV Literature Library)” and “Any commissioning notes for this customer/installation, available from the Rockwell
Automation Application Specialist or Project Manager.”
Added “(also available through ShopView/SAP).” to bullet “Rockwell Automation electrical and mechanical diagrams
for each drive”
Added “materials available from the MV website using the order number as a reference” to “PLC program (if supplied
with a PLC)”
Added “the Rockwell Automation Project Manager or” to “If any of the above information is not available prior to the
time of commissioning, please contact the factory.”
Added point: “Black Box Data before leaving the site, followed by instructions on relevant Tech Note.”
Added point: Ensure the drive hardware and parameters are correct, Such as HECS/CT ratio and burden resistors
installed in the drive are accurately programmed in drive parameter settings
Added Note: “Note: For variations in drive cabinetry (such as the heat pipe B Frame or Marine liquid-cooled drives)
please refer to the appropriate Installation Manual for that drive.)”
Changed output voltage value for IGDPS board from +1% to +2%
Updated sample waveform graphics
Removed sample AFE waveforms from Load Test section to synchronize with other Commissioning documentation
Added Printing and Uploading Drive Data as Appendix
Re-added Specifications as Appendix