History of Changes

This appendix summarizes the revisions to this manual. Reference this appendix
to determine what changes have been made across multiple revisions.

7000-IN006A-EN-P,
September 2011

Change

Commissioning material removed to new manual

Converted documentation from Word to FrameMaker

Conditionalized text in shared chapters

Specifications removed to Technical Data publication

Numbering styles for graphics and tables changed

Significant rewrites to change passive to active voice

Replaced words for cursor keys with symbols

Added consistent formatting for key names, i.e. [Enter]

Removed all references to 6-pulse motor controllers

Significantly reduced text in Intro chapter to remove sales-oriented content in favour of a focus on technical content
relevant to post-sales user documentation.

Added paragraph: “Use this document in conjunction with the most recent version of the Rockwell Automation
“Commissioning Guidelines for MV PF7000 [A/B/C] Frame Drives with ForGe Control” document, available to field
service engineers on the Intranet at http://rain.ra.rockwell.com/mvb.”

Replaced last three bullet points from “Before Commissioning” section with text: “Applying power and tuning or
performance-testing the drive are part of the actual commissioning process, not part of the preparation”

Added “Commissioning Guide lines for Rockwell Automation MV PF7000 Frame drives (available internally at http://
rain.ra.rockwell.com/mvb)” to list of required TechPubs

Added resource bullets: “Functional specifications for the drive to be commissioned (generally available from the online
MV Literature Library)” and “Any commissioning notes for this customer/installation, available from the Rockwell
Automation Application Specialist or Project Manager.”

Added “(also available through ShopView/SAP).” to bullet “Rockwell Automation electrical and mechanical diagrams
for each drive”

Added “materials available from the MV website using the order number as a reference” to “PLC program (if supplied
with a PLC)”

Added “the Rockwell Automation Project Manager or” to “If any of the above information is not available prior to the
time of commissioning, please contact the factory.”

Added point: “Black Box Data before leaving the site, followed by instructions on relevant Tech Note.”

Added point: Ensure the drive hardware and parameters are correct, Such as HECS/CT ratio and burden resistors
installed in the drive are accurately programmed in drive parameter settings

Added Note: “Note: For variations in drive cabinetry (such as the heat pipe B Frame or Marine liquid-cooled drives)
please refer to the appropriate Installation Manual for that drive.)”

Changed output voltage value for IGDPS board from +1% to +2%

Updated sample waveform graphics

Removed sample AFE waveforms from Load Test section to synchronize with other Commissioning documentation

Added Printing and Uploading Drive Data as Appendix

Re-added Specifications as Appendix

Commissioning material removed to new manual