2 commissioning steps (overview), Commissioning steps (overview), Commissioning – Lenze ECSCSxxx User Manual
Page 94

Commissioning
Commissioning steps (overview)
l
94
EDBCSXS064 EN 4.0
6.2
Commissioning steps (overview)
Start
Carry out
basic settings
(
Select
operating mode/control structure
(
Set machine parameters for
speed control
(
^ 141)
Set machine parameters for
torque control
(
l
Switch on the mains.
l
Enable controller (
^ 154).
l
Save parameters in the controller with
C0003 = 1.
l
Save parameter set with GDC in the
parameter set file.
Optimise
drive behaviour
(
l
Save parameters in the controller with
C0003 = 1.
l
Save parameter set with GDC in the
parameter set file.
End