Preparing, Operating procedure, During a – HP XP P9500 Storage User Manual
Page 352

•
YKQUERY
•
YKRESYNC FORWARD
•
YKEWAIT GOTO(DUPLEX)
4.
Execute the YKEWAIT GOTO(SUSPEND) command and wait until the status of the Continuous
Access Journal Z copy pair between the intermediate site and the remote site has changed to
SUSPOP
.
5.
Resume operation at the primary site.
6.
From the primary site, execute the YKRESYNC command for the Continuous Access Journal Z
copy pair between the intermediate site and the remote site.
•
YKQUERY
•
YKRESYNC
•
YKEWAIT GOTO(DUPLEX)
Operation returns to normal.
Operating procedure during a path failure between the storage systems at the primary
site and the intermediate site
The following are operating procedures that must be performed when a path failure occurs between
the storage systems at the primary site and the intermediate site.
Preparing
For details about the preparing procedure required when a path failure occurs between the storage
systems at the primary site and the intermediate site, see the preparatory procedure used when a
nonvolatile failure occurs in the intermediate site storage system. For details, see
in
“Operating procedure during an intermediate site storage system failure (nonvolatile)”
.
352 Maintenance and troubleshooting operations