Single test view vs. multiple test view – In-Situ TROLL 9500 Operators Manual User Manual
Page 46
39
TROLL 9500 Operator’s Manual
0095110 rev. 007 01/09
OTHER TEST OPERATIONS
There are six basic test operations:
s
of this section for details.
s
before the test runs. Editing a test launches the Test Wizard. See
the first part of this section for details.
s
start.
s
s
host computer. A copy of the data remains in the instrument.
SECTION 6: LOGGING DATA
When a single test is selected in the Navigation tree, the Information pane
shows details about the selected test.
When the Tests node (group view) is selected, the Information pane shows all
tests and displays the Add... button. #DPs is the number of data points logged.
When multiple tests are selected in the Information pane, multiple tests may
be extracted or deleted simultaneously.
Single test view vs. Multiple test view
When a test is selected in the Information pane, the Clone... button is
available to copy the test definition—saves time in setting up tests.
Pending test—manual start
Completed test
Running test
Pending test—scheduled start
ABEND test
(came to an ABnormal END,
e.g., by losing power or
filling the memory)
s
s
The operations available depend on the status of the selected test. A
different symbol is displayed for each test status: