In-Situ TROLL 9500 Operators Manual User Manual
Page 28
21
0095110 rev. 007 01/09
TROLL 9500 Operator’s Manual
1
2
SECTION 3: GETTING STARTED
SET UP TO LOG DATA (SET UP A TEST)
A “test” is a set of instructions to the instrument’s internal data logger
for collecting a set of data—including which parameters to measure,
how often, and when to start. Section 6 below contains detailed infor-
mation on setting up tests.
1. With the MP TROLL 9500 connected to a host PC, click or tap
Tests in the Navigation tree.
2. Click or tap Add....
The Test Wizard will help you enter the information. The choices
are discussed in detail in Section 6 below.
3. When you finish the Wizard, Win-Situ sends the information to the
device and updates the display.
If you added
“scheduled” test (indicated by in the Navigation
tree), it will start at its programmed time.
If you set up a test
or a manual start (indicated by in the Navi-
gation tree), you can start it at any time by pressing the Start button
while connected in software.
TIP: For complete information on setting up tests, refer to
Section 7 of this operator’s manual.
COMPLETE THE SETUP
If real-time readings are not required, remove the TROLL Com from
the cable after programming.
Protect the “uphole” end of the cable with the cable dust cap or desic-
cant.
The cable dust cap is not waterproof. Be sure it is
positioned above the highest anticipated water level. Avoid
areas that may flood.
If cable will not be used, attach a Twist-Lock Hanger to the TROLL
9500.
The instrument is now ready for transport to the site where it will be
used to take measurements.