beautypg.com

Point staking summary, Conventional fieldwork – Spectra Precision Survey Pro v4.5 Ranger User Manual User Manual

Page 80

background image

User’s Manual – Conventional Mode

70

d. The rod needs to move back by 0.2 feet

to be over the design point. Rather

than take another shot, we will use a
tape measure and place a stake at that
location. Tap the

.

Store/Tape… button

to store the point.

e. Enter the following data in the Store

Point (Tape Offset) Dialog Box:
Point Name

: 6

Description

: Staked

Tape Out/Tape In (+/-)

: 0.2

and tap . This will result in coordinates for the stored point

that are 0.2 feet further from the total station than the last
shot to the prism.

Note: The default value in the Tape Out/Tape In field should put you
directly over the design point, assuming you are on line.

Note: Negative Tape Out/Tape In values are toward the total station
and positive values are away from the total station.

Point Staking Summary

1. Open a job that contains the design points that you want to stake.
2. Check the job settings.

3. Setup a backsight.
4. Stake the points from the Stake Points screen.