Collect check point prompt, Collect check poin t screen – Spectra Precision Survey Pro v4.5 Ranger User Manual User Manual
Page 331
Basic GPS Module
321
Collect Check Point Prompt
1. Select an existing job file point.
2. Designate if it is valid for horizontal,
vertical, or 3D control.
3. Level the receiver over the point and
tap Start Control Point Occupation. This
will open the Collect Check Point
screen, below, to monitor the
occupation.
Collect Check Point Screen
1. Examine the errors. Only the errors for
the dimensions you specify for this
control point (2D/1D/3D) will be shown.
2. Tap Accept to finish the occupation.
The control point is created in the job
file and the raw data is recorded. This
screen and the previous screen will exit,
and you will be at one of two places:
a. If you do not have one extra H
or V point for the localization
check, you will be back at the
Check Points Status screen
(Page 320).
b. If you have the required H and V points for the check,
the wizard will advance to the Solve Localization and
Detect Blunders screen, below.