beautypg.com

Spectra Precision Survey Pro v4.5 Ranger User Manual User Manual

Page 255

background image

GPS Module

245

b. When the rover does not receive the base antenna

information, and the base point exists in the job file,

Survey Pro calculates the antenna from the base
height and the reference position antenna phase

center height. The antenna Measure To displays
Calced. by SP,

and the Measured field displays the

calculated value.

c. When the rover does not receive the base antenna

information, and the base point is new in Survey Pro,
you are prompted to enter the known antenna height

in order to store the new point on the ground, or leave
the antenna height at 0.0 to store the new point at the

base antenna phase center. The antenna Measure To

will display Entered in SP, and the Measured edit box
is enabled for you to enter the value.