beautypg.com

Spectra Precision Survey Pro v4.5 Ranger User Manual User Manual

Page 79

background image

Conventional Fieldwork

69

h. According to the screen, the rod must

now move FORWARD by 0.089 feet to
be over the design point. We will
assume that this is close enough and

will store the point from this shot by
tapping the Store… button.

i. Enter the following point information:

Point Name

: 5

Description

: Staked

and tap . This will return you to the

first Stake Points screen.

5. Stake the next design point.

a. We want to stake the next design point

in the project. Make sure 3 is in the
Design Point

field and then press

Solve > . This will send you to the

second Stake Points screen.

b. The information needed to locate the

next design point is displayed. When
connected to a total station, you would

turn the total station horizontally to

115°00’00", vertically to 90°00’00" and

send the rod man out about 100 feet before continuing. Tap
the

.

Stake >

.

button to continue to the third screen.

c. Tap the Shot button and enter the following shot data:

Angle Right

: 115

Zenith

: 90

Slope

Dist: 99.8

and then tap to continue.