Leveling stakeout – Spectra Precision Survey Pro v4.5 Ranger Reference Manual User Manual
Page 273
Level Menu
R-265
Leveling Stakeout
Leveling Level
Stakeout >
.
The Leveling Stakeout screen is used to measure the elevation at an
existing point and compute a cut/fill value.
Stk Point: is the point in the current job that
you want to shoot to determine the cut/fill
value. (The location for this point must be
known in advance since the leveling routine
cannot compute horizontal coordinates.)
Backsight Point: Lists the details for the
current backsight. If this is the first
observation from the current set up, most of the
details will be unknown.
Next > : opens the Take Shot screen (Page R-
262) where the required shots are performed.