Section 3: Installing the Instrument

05/11 17

51209 Revision 2

3

Installing the Instrument

Before starting work, please read Chapter 1 and follow all instructions.

Further procedures:

Check the consignment: unpack the components specific to the application.

Safety check: inspect all components for damage.

Make sure the on-site installation is correct and complete including cables, e.g. power cable fuse

protection, load cells, cable junction box, data cable, console/cabinet, etc.

Follow the instructions for installation of the unit relating to application, safety, ventilation, sealing

and environmental influences.

Connect the cable from cable junction box or platform/load cell.

If applicable: connect other data cables, network cables, etc.

Connect the instrument to the supply voltage.

Check the installation.