beautypg.com

AMETEK SFA Series Ethernet Programming User Manual

Page 147

background image

SG Series Programming

Calibration

M550129-03 Rev K

7-13

Preparation:

1. Remove prime AC power.

2. Connect the power supply to a precision current shunt (Figure 7-2) capable of

a minimum of 10% above full rated output. A fan may be required to cool the
shunt.

J3

SHUNT

SUPPLY

OUTPUT

TERMINALS

+

-

J3-1: SENSE (+)

J3-2: SENSE (-)

J3-3: SENSE (-), 800V ONLY

Figure 7-2. Precision Current Shunt