Perform the standard tests, User i/o, Perform the standard tests –10 – Altera High-Speed Development Kit, Stratix GX Edition User Manual
Page 54

5–10
Quartus II Version 3.0
Altera Corporation
Perform the Standard Tests
High-Speed Development Kit, Stratix GX Edition User Guide
Figure 5–14. Board Completely Set Up
21. Power up the board by moving switch SW3 to the on position. The
board power ups with all of the user LEDs illuminated and the 
7-segment displays turned on. 
The board is now set up and you are ready to perform the tests.
Perform the 
Standard Tests
In this section you will perform all of the standard tests. For each test, you 
will load a SOF onto the board. These SOFs are located in the 
Stratix_GX_kit\test_designs\standard_test_designs\standard_sofs 
directory. 
1
Table 5–1 on page 5–36 is a worksheet for the tests. You should 
have a printed copy of this worksheet when you perform the 
tests so that you can note the test results in the appropriate 
row/column in the worksheet.
User I/O
For this test, perform the following steps.
1.
Run the Quartus II software. Keep the software open until you 
finish all of the tests.
2.
Choose Programmer (Tools menu). Leave the Programmer open 
until you finish all of the tests.
