4-10 Operating Your SLC 500 Backup System

Power Down Sequencing

No special considerations (beyond the standard precautions for a
programmable controller) are required when powering down the
system. Power down should begin with the secondary system and
proceed to the primary. If the primary system is powered down first, a
switchover occurs.

Restarting a Failed System

A failed system that has been repaired can be restarted as described in
the following sequence. It is not necessary to power-down or change
the mode of primary SLC 5/0x.

1. Set the secondary SLC 5/0x (processor of the repaired system) to

program mode.

2. Apply power to the secondary system.

3. Download the applications program to the secondary SLC 5/0x.

4. Change the backup processor mode of operation from Program

mode to Run mode.